We have successfully completed the Civil, Mechanical and Electrical construction work for the 30 MW power plants for electricity supply to the Lafarge Surma Cement Factory at Chhatak. For our client Wartsila, the power plant was installed with four gas engines for base load operation and two diesel engines for peak load operation.
RAK Power Ltd, a company of RAK Ceramic Ltd, awarded us the turnkey contract for supplying the balance of the plant equipments, and for civil, mechanical and electrical construction work of a 6 MW power plant for electricity supply to the RAK Ceramic Factory at Maona, Gazipur with the provision to expand it to 12 MW capacity. The Plant is in operation.
Besides, Dipon Gas has been a turnkey contractor for Gas Booster Compressor, MRS and DRS for various power plants including Haripur 100 MW Power Plant, Malancha 40 MW Power Plant at DEPZ, Dhaka and Malancha 45 MW Power Plant at CEPZ, Chittagong.
Also we have accomplished overhauling of 60 MW Power Station at Khalishpur, Khulna and Sikalbaha, Chittagong and 67 MW Power Station at Karnaphuli Hydro Unit-3, Rehabilitation Project at Kaptai, Chittagong.